Long-Range Schedule
Publications
Science Highlights
APS/User News
Directory
Useful Links
DEIA
Contacts
Search APS Website
Search
a U.S. Department of Energy Office of Science User Facility
About
Overview
Visiting the APS
Code of Conduct
Diversity, Equity, Inclusion & Accessibility Council
Mission & Goals
Organization Charts
PSC Leadership
APS Director’s Office
Committees
ANL Job Openings
APS Job Openings
Storage Ring Parameters
APS Conference Rooms
The Advanced Photon Source Strategic Plan
Early Science at the Upgraded Advanced Photon Source
Seminars & Meetings
More
Safety
PSC Safety Resources
Electrical Safety
EFOG
User Safety and Training
Building and Site Services Coordination
Safety & Emergency Management
More
Organization
APS Director’s Office
User Program Office
Photon Sciences Communications and Information Resources
Photon Sciences Portfolio Management Office
Accelerator Systems Division
Accelerator Operations & Physics
Controls
Diagnostics
Magnetic Devices
Power Systems
Radio Frequency
MCR
APS Engineering Support Division
Information Solutions
Information Technology
Design and Drafting
Experimental Facility Operation Group
Mechanical Engineering and Design
Mechanical Operations and Maintenance
Safety Interlocks
X-ray Science Division
Inelastic X-ray & Nuclear Resonant Scattering (IXN)
Magnetic Materials (MM)
Materials Physics and Engineering (MPE)
Surface Scattering and Microdiffraction (SSM)
Time-Resolved Research (TRR)
Chemical and Materials Science (CMS)
Dynamics & Structure (DYS)
GMCA Structural Biology Facility (MX)
Imaging (IMG)
Microscopy (MIC)
Spectroscopy (SPC)
Structural Science (SRS)
Beamline Controls (BC)
Beamline Instrumentation (BI)
Computational Science and Artificial Intelligence (CAI)
Detectors (DET)
Nanopositioning Support Lab
Optics (OPT)
Scientific Software Engineering and Data Management (SDM)
APS Upgrade Project
Organization Charts
More
User Info
User Check List
Returning to APS
Training for Users
Shipping Samples
ESAF system login
Proposal system login
More
Beamlines
Beamlines Directory
Comparable Beamline Options for Users
Requirements for Restarting Beamlines After the Shutdown
Sectors Directory
More
Machine Status
APS Storage Ring Current History
More
APS Upgrade
Media Center
APS/User News
Science Highlights
APS Fact Sheets
Image Bank
More
Home
About
ANL Job Openings
APS Job Openings
APS-U
APS/User News
Beamlines
Contacts
DEIA
Directory
Document Central
Guest House
Industry
Intranet
Long-Range Schedule
Machine Status
Media Center
Organization
Publications
Safety
Science Highlights
Search
User Info
Useful Links
Work with Us
APS Upgrade News
10.05.2021
Fountain of Youth: Michael Kelly’s Work Will Grant Longer Life to the Upgraded APS Electron Beam
09.15.2021
Through the Looking Glass: How a State-of-the-Art Optics System Will Make the APS Upgrade Possible
08.30.2021
Pictures of progress: The APS Upgrade’s Long Beamline Building takes shape
08.06.2021
1,000th Magnet Arrives for APS Upgrade
12.18.2020
Some Assembly Required: APS Upgrade Takes First Practice Run Building Modules for the New Storage Ring
07.23.2020
Argonne Breaks Ground On New State-of-the-Art Beamlines for the Advanced Photon Source
12.03.2019
Mechanical Removal Vendor Information Day
08.26.2019
Argonne’s Advanced Photon Source to Get $815 Million Upgrade
07.30.2019
DOE Gives “Green Light” to Upgrade Argonne’s Advanced Photon Source
12.14.2018
DOE approves technical plan and cost estimate to upgrade Argonne facility; Project will create X-rays that illuminate the atomic scale, in 3D
Pagination
First page
« First
Previous page
‹‹
Page
1
Page
2
Page
3
Page
4
Page
5
Current page
6
Page
7
Page
8
Page
9
Next page
››
Last page
Last »
Subscribe to News