Other information which may be found in the beamline cabinet:
- Shutter Authorization Form: Allows the FC on-call to open the shutter in a user's absence when shutter permit is returned after a storage ring fill. (Green sheet)
- Beamline Operational Status: Following shielding verification, specifies conditions under which a beamline may operate.May include such information as current limit (e.g. 100 mA), gap limit (e.g. 11 mm), white beam or monochromatic beam mode, and any special conditions.The Beamline Operational Status is provided by the Radiation Safety Officer for AES.
- Configuration Control Work Permit (CCWP) submitter list: Lists the beamline personnel who are authorized to submit a CCWP for work on a beamline (such as opening a labyrinth).
|