With to the on-going LINAC re-tuning effort, it is critically important that the accelerating structures of L1~L6 have a basic protection through rf power monitoring with EDM's. Currently all 12 EDM's are installed and in operation. There are no functional spares available. Therefore, we need to do a re-production run for 8 EDM units for further installation need, and spares. |