Purpose | ||||||||||||||||||||||||||||||||||||||||||||||||||||
The APS Beamline Commissioning Readiness Review Team (BCRRT) reports to and advises the AES Associate Division Director for Mechanical and Interlock Systems for all activities related to commissioning of new beamlines or beamline modifications. Changes to this charter require the approval of the AES Division Director. BCRRT is mainly responsible for reviewing the readiness of new and modified beamlines for commissioning.A subset of the members of the BCRRT form the Beamline Commissioning Team (BCT), which conducts the commissioning of new beamlines.All outstanding issues from the Beamline Safety Design Review Steering Committee (BSDRSC) review are addressed at the BCRRT meetings. The plans for commissioning a new beamline are reviewed to ensure that the components and equipment designs satisfy ANL and APS safety and operations requirements.Plans will be reviewed for consistency with APS schedules. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Membership | ||||||||||||||||||||||||||||||||||||||||||||||||||||
The committee members are appointed by the AES Division Director and are listed below:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Method | ||||||||||||||||||||||||||||||||||||||||||||||||||||
The request to conduct a BCRRT review is initiated by the beamline staff through the floor coordinator with the concurrance of the Associated Division Director for Mechanical and Interlock Systems (AES/ADD-MIS). A BCRRT review will also be initiated on the direct request by the AES/ADD-MIS or the AES Division Director. The Committee will:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Frequency of Meetings | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Meetings will be held at the direction of the Committee Chair in response to requests for commissioning of new beamlines, and for modifications to existing beamlines. |