APS Long-Range Operations Schedule (Fiscal Year 2024)

Alternate Formats: Excel | PDF

iCal not currently available. 

APS Long-Range Operations Schedule                                  
 
Run 2024-1     
 
May Jun Jul Aug Sep 
 1   1   1   1    
 2   2   2   2     
 3   3   3   3  
 4   4   4    
 5   5   5    
6   6   6   6    
7   7   7   7    
8   8   8   8    
9   9   9   9    
10   10   10   10    
11   11   11   11    
12   12   12   12    
13   13   13   13    
14   14   14   14    
15   15   15   15    
16   16   16   16    
17   17   17   17    
18   18   18   18    
19   19   19   19    
20   20   20   20    
21   21   21   21    
22   22   22   22    
23   23   23   23    
24   24   24   24    
25   25   25   25    
26   26   26   26    
27   27   27   27    
28   28   28   28    
29   29   29   29    
30   30   30   30    
31    31  31    
 
  User Operation in standard lattice SOM Periods  Machine Studies/commissioning  Weekends 
  User Operation in Reduced 1Hybrid Fill - (singlet)  Maintenance  Lab Holidays 
 Horizontal Lattice(RHB) 4  Shifts set aside for Studies/  Beamline commissioning/User Ops 
 4 Machines Intervention as Needed Unless needed for SR Commissioning 
 Swap Out Operations is standard unless '*  SR vacuum conditioning 
 indicated in fill pattern Fill pattern is 24 singlets unless otherwise indicated by number 
 Breakdown of User Shifts by Fill Pattern 
 Number of 8-hour User Shifts 
 ================================================================================ 
  24 Singlets - Hybrid Fill -  324 Singlets - Non Top-Up Total Shifts Total Hours 
2024-1 152 0 0 152 1216 
 '================================================================================ 
SUM 152 0 0 152 1216