EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  <20062007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  <20062007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: ISAC-II beam
From: Rolf Keitel <[email protected]>
To: tech_talk <[email protected]>
Date: Wed, 03 May 2006 10:57:15 -0700
Here is some delayed news (I was on vacation - I should do this more often, then good things happen).

On April 10, the ISAC-II facility accelerated a 40C (10+) beam through the new superconducting linac (20 superconducting RF cavities) to 220 MeV (5.5 MeV/u). This achieved the last mile-stone of a five-year development program, which was carried out in parallel to the routine running of the ISAC-I radioactive beam facility.

This is another success for EPICS. Our sincere thanks go to everybody in the EPICS community who helped with ideas, support, tools, etc. to keep our fun-level high.

- rolf -

--
+-------------------------------------------------+
| Rolf Keitel, TRIUMF         Tel: (604) 222-7453 |
| Group Leader ISAC Controls  Fax: (604) 222-7307 |
| and Electronics Development                     |
| Vancouver, B.C., Canada                         |
+-------------------------------------------------+


Navigate by Date:
Prev: Artificial Intelligence (AI) / intelligent control in the accelerator control room Martin Pieck
Next: Re: Sequencer intro needed ! Benjamin Franksen
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  <20062007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: Artificial Intelligence (AI) / intelligent control in the accelerator control room Martin Pieck
Next: Power Monitoring Waggoner, Bill
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  <20062007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 02 Sep 2010 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·