7ID Schedule for Run 3 of FY2005

See this link for APS Operational data and schedules.
Here is the link for the FY2005 schedule of the APS.

Note that from Jun. 7 to Jun. 20, the APS runs in hybrid mode with a large
current singlet. One period of 324 bunch mode runs is scheduled, Jul. 6-11.
One week of 1296 bunch mode is also planned August 3-8.

Sector 7 schedule for the summer run of 2005
(FY05-run3 also called 2005-2 by APS)

 Here is the link for the FY2005 schedule of the APS.
The (STAFF) flag indicates beamline staff time. The (PUP) label indicates beam 
awarded through David Reis's Partner User Proposal(PUP-13), or Linda Young's
PUP-37 and each APS GUP proposal is labelled with its proper number. A list
of all current APS Partner User Proposals is available here.  The (COMM) label
is reserved for commissioning and alignment.

      Dates               Shifts        User

6/01  8AM  -  6/06  8AM  :   9  :  Staff (COMM) Beamline alignment
6/01  8AM  -  6/06  8AM  :   6  :  Linda Young (PUP-37) (7ID-D)
6/07  8AM  -  6/20  8AM  :  38  :  Linda Young (PUP-37) (7ID-D)
6/21  8AM  -  6/28 12AM  :  20  :  Roy Clarke (GUP-1506) (7ID-C)
6/28  8AM  -  7/04  8AM  :  18  :  Walko (STAFF) (7ID-C)
7/06  8AM  -  7/11  4PM  :  16  :  Dufresne (STAFF)
7/12  8AM  -  7/18  8AM  :  18  :  Paul Evans (GUP-3824) (7ID-C)
7/20  8AM  -  8/01  8AM  :  35  :  David Reis (PUP-47 + GUP-4299) (7ID-D)
8/03  8AM  -  8/08  4PM  :  16  :  Alejandra Lukaszew (GUP-3730) (7ID-B) 
8/09  8AM  -  8/10  8AM  :   3  :  Dufresne (COMM) (7ID-B)
8/10  8AM  -  8/15  4PM  :  16  :  Jim Penner-Hahn (GUP-1964) (7ID-B)
8/16  8AM  -  8/18  4PM  :   7  :  Jonathan Lang (GUP-4465) (7ID-B)
8/18  4PM  -  8/22  8AM  :  11  :  Kamel Fezzaa (GUP-2572) (7ID-B)
8/22  8AM  -  8/26 12AM  :  11  :  David Reis (PUP-47) (7ID-D)

In June, our 7ID-A beamline monochromator stopped scanning smoothly. We were
not able to fix the problem and will have to remedy it in the September
shutdown.  PUP-37 was affected by this problem, and some of the experimental
program had to be modified. Eric Landahl's experiment (GUP-4171) could not be
scheduled due to this beamline problem.

---------------------------------
total                    224 shifts
operation allowance (8%)  18 shifts
GUP baseline       (92%) 206 shifts

                       Avail. shifts  Allocated shifts
COMM (commiss. & align.)  18 shifts   (9+3)=12
PUP-37 (hybrid run)       38 shifts   38+6=44
PUP-47 (15% of 206)       31 shifts   ~18+11=29
Staff (20% of 206)        41 shifts   (18+16)=34
GUP   (reminder of 206)   96 shifts   (11+7+16+~17+16+18+20)=105
total:                   224 shifts   224

Last updated by Eric Dufresne on 07/20/2005.