Argonne National Laboratory

Advanced Photon Source
Sector 7

Argonne Home > Advanced Photon Source >

Sector 7 7ID Schedule


/Sectors/Sector7/Operations/2005/7IDschedule_FY05_run2_stats.html

7ID Schedule for Run 2 of FY2005

See this link for APS Operational data and schedules.
Here is the link for the FY2005 schedule of the APS.

Note that from Mar. 16 to Mar. 21, the APS runs in hybrid mode with a large
current singlet. Two separate 324 bunch mode runs are scheduled, Jan. 31-Feb. 7,
and Mar. 2-7. 

Sector 7 schedule for the winter run of 2005
(FY05-run2 also called 2005-1 by APS)

 Here is the link for the FY2005 schedule of the APS.
The (MHATT) label indicates Sector 7 beam time. The (STAFF) flag indicates
beamline staff time. The (PUP) label indicates beam awarded through David 
Reis's Partner User Proposal(PUP-13), or Linda Young's PUP-37 and each APS GUP
proposal is labelled with its proper number. The (COMM) label is reserved for
commissioning and alignment.

Jan 31/8am-Jan 31/4pm(01) (7ID-A)   Beamline monochromator alignment.(COMM 1)
Jan 31/4pm-Feb 07/4pm(21) (7ID-C)   Dubon (GUP-3255 21) 
Feb 08/8am-Feb 14/8am(18) (7ID-C)   Walko (STAFF 18) 
Feb 16/8am-Feb 22/0am(17) (7ID-C)   Reis (GUP-3763 17) 
Feb 22/8am-Feb 28/8am(18) (7ID-C)   Reis (PUP-47 18) 
Mar 02/8am-Mar 07/4pm(16) (7ID-B)   Dufresne (COMM 15+ STAFF 1)
Mar 08/8am-Mar 14/8am(18) (7ID-B)   Lukaszew (GUP-3730 18)  
Mar 16/8am-Mar 18/4pm(7)  (7ID-B)   Belak (GUP-3482 7)
Mar 18/4pm-Mar 21/4pm(9)  (7ID-B)   Fezzaa (GUP-2572 9)
Mar 22/8am-Mar 29/0am(20) (7ID-C)   Evans (GUP-3824 12) + Dufresne (Staff 8)
Mar 29/8am-Apr 04/8am(18) (7ID-C)   Pereira (GUP-3199 15) + Reis (PUP-47 3)
Apr 06/8am-Apr 9/8am (9)  (7ID-C)   Walko (Staff 9)
Apr 09/8am-Apr 11/4pm (7) (7ID-C)   Belak (GUP-3481 7)
Apr 12/8am-Apr 15/8am(9)  (7ID-D)   Reis (PUP-47 9)
Apr 15/8am-Apr 21/0am(17) (7ID-D)   Adams (GUP-3180 17)

---------------------------------
total                    205 shifts
operation allowance (8%)  16 shifts
GUP baseline       (92%) 189 shifts

                       Avail. shifts  Allocated shifts
COMM (commiss. & align.)  16 shifts   (1+15)=16
PUP-37 (15% of 92%)        0 shifts   (0)        Not running this cycle.
PUP-47 (15% of 92%)       28 shifts   (18+3+9)=30
Staff (20% of 92%)        38 shifts   (18+1+8+9)=36
GUP   (65% of 92%)       123 shifts   (21+17+18+9+7+17+12+15+7)=123
total:                   205 shifts

Last updated by Eric Dufresne on 04/12/2005.
U.S. Department of Energy UChicago Argonne LLC Office of Science - Department of EnergyOffice of Basic Energy Sciences - Department of Energy
Privacy & Security Notice | Contact Us | Site Map