CAT Chat Minutes

04/20/2009

Operations, Patricia Fernandez

Fernandez announced that there had been 2 drops this past week, one lasted about 1-½ hours and the other one lasted 3 ½ hours. There was also some downtime at 2-ID totaling 253 minutes. The Percentage of Scheduled Beamtime was 98.49% and the Meantime Between Faults equaled 69.89 hours.

Reminder, John Quintana

Quintana reminded everyone that the chilled water to the APS complex will be shut down on Saturday, April 25th. All unnecessary equipment should be turned off in order to reduce the heat load in the buildings.

The current run ends on Wednesday, April 22nd. The next one begins on Wednesday, May 27th. CAT Chat will resume on Monday May 18th if there is a need, if not, it will resume on Monday, June 1st.

Next Meeting: Monday, June 1, 2009