Machine Stats
Currently in run 2005-03, 1296 mode continues until midnight on 12/21/2005.  Machine studies begin 12/22 at 12:00 a.m. through 8:00 a.m.; shutdown starts 12/22/2005 at 8:00 a.m.

  Delivered beam:  1528.60 Hours
   Percentage of scheduled time: 96.87 %
   Downtime during period:  49.43 Hours
   Mean time between faults:  69.48 Hours

Beamline Downtime

Fill

Reason

Downtime

# 31  12/14 08:00  To  12/15 09:03   25.05 

 RF4 HVPS problem    [RF]

  0.93 RF4 Cathode V dropped, switch to direct inj.,refill

# 32  12/15 09:58  To  12/19 16:44  102.77 

 14-ID EPS trip      {SI]

  0.91 Switch to direct injection, refill

# 33  12/19 17:39  To  12/20 08:08   14.49 

 IOCmtime problem   [CTL]

  2.85 IOCmtime GPIB card [2.42 CTL],RF4 N2 hose [0.43 RF]

# 34  12/20 10:59  To  12/20 19:13    8.24 

                         

  0.64 

# 35  12/20 19:52  To  12/20 22:43    2.85 

                          

  0.70 

# 36  12/20 23:25  To  12/21 09:05    9.66 

 Fill Ongoing            

 -0.00 

 

Seven Day Storage Ring Current & Beamline History
SR Status Week Status History Image

 

Safety
New user shop lead machining policy and the safety inspections currently underway.  For further details, contact E. Chang, AOD Safety, pager  4-1888; email change@aps.anl.gov

Announcements
The announcement for CAT Chat was not made until 3:00 p.m.; Jan Ilavsky asked that the announcement be made on time every Monday.  Reinhard Pahl asked that at least 5 minutes elapse between the announcement and the start of CAT Chat.  The main control room will be notified of this request.

John Unik asked about the status of the booster power supply.  Patricia Fernandez replied that the problem was due to a phase difference on the power supply input.  There is a temporary fix in place that allows for injection every 12 hours (1296 mode); a permanent fix will be pursued during the shutdown.