Machine Stats
Delivered beam:   254.38 hrs.
Percentage of scheduled time:   96.33%
Downtime during Period:   9.69 hrs.
Mean Time between Faults (MTBF):   50.88 hrs.

Beamline Data
Summary by APS groups, June 6-13, 2005

DIN

Date

Beamline

Status

Duration

Group

Description

Resolution

516

06/06/05

ALL

Open

16 min

AOD-IT

A faulty network switch impacted EPICS controls. Network personnel were able to bypass the switch. It should be changed soon.

 

518

06/12/05

10-ID

Open

2 hr 37 min

ASD-SI

10-ID-B pneumatic door won't close. BP thinks there is an issue with the air pressure.

 

Safety
E. Chang announced that a meeting was held by the APS Laser Safety Committee.   A one-page checklist for laser alignment is being composed.   A draft of the checklist will be circulated to the APS and LCA supervisors.

"Thank you to Reinhard Pahl for volunteering his services and equipment to help Vijay Tirumala develop a laser installation in 401/L1112.

Essential Sector Specific Communications J. Quintana:   Machine fault notification is less than ideal.   We would like messages to be sent when the ring comes back, more discussion about this will take place at the next TWG meeting (Thursday, June 16th).  

User said, at one time diagnostics group personnel scanned their beam and left it open.   They were not aware it was done.   For several months they performed testing to see why the beam was weakened.   John explained that we are looking at a notification system that would result in no undue downtime.