Paul Zschack said he had a situation at 34ID last week with kinematic mounts under critical components (white beam mask) in FOE.  There is a potential shifting of component position due to unequal vacuum pressures.  The component should be labeled individually as a critical component and the unequal pressure issue addressed.  Did anyone else have this problem?

Roger replied that this was an APS responsibility and hell look into the problem.

 

User Operations

Machine Status R. Klaffky:  Roger presented the following stats as of 3/24/03

Delivered beam:  1075.96 Hours
Percentage of scheduled time (*) 97.37 %
Downtime during period:  29.06 Hours
Percentage of scheduled time SR current > 10 ma 98.37%
Average delivered current during period:  97.49 ma
Mean time between faults (MTBF)38.43 Hours
Faults per day of delivered beam0.62

Beamline Faults:  There were three reported machine faults over the last week:

# 68  03/18 16:00  to  03/20 10:06   42.10  RF4 Power loss      [RF] 0.29 Refill
# 69  03/20 10:24  To  03/21 12:26   26.04 2ID PSS trip        [ES] 0.61 Magnet Standardize, refill
# 70  03/21 13:02  To  03/22 04:07   15.08  RF4 cav.Vac.Flt     [RF] 0.18 Refill
# 71  03/22 04:18  To  03/24 07:59   51.69 Int Dump: End of Period  0.00 

Girder Displacement Schedule O. Singh:  Om presented an updated schedule of girder displacements (follows):

Sectors

Displaced Dates
To be displaced schedule
Cleaned Xbpms ID
Comments
1
No schedule
2,3,4
October, 2000
2,3
5
January, 2001
4
6,7,8
April, 2001
5,6,7
9,10
January, 2003
8,9
11,12,13
April, 2003
10,11,12
14
January, 2004
13,14
15,16,17
May, 2002
15,16
18,19,20
September, 2002
17,18,19
21
January, 2003
20,21
22,23
January, 2002
22
24
January, 2004
23
25,26,27
May, 2004
24,25,26
28,29,30
No schedule
27,28,29,30
 
31
January, 2004
31
32
July, 2000
32
33
April, 2000
33
34,35
January, 1999
34
36
No schedule
37,38,39,40
No schedule
RF systems - no BL

 

 

 

 

 

 

 

 

 

 

 

 

 

Note 1 - Next Shutdown schedule - April/May 2003  sectors 11,12,13
Note 2 - No Girder displacement work during September, 2003 shutdown due to other Survey group commitments.

This schedule is also displayed on the APS website at url: http://www.aps.anl.gov/asd/diagnostics/xaxstf/distortSched.html

Shipments of Radioactive Material & Foreign Soil B. Glagola:  Bruce explained that DOE has stopped all radioactive material shipments.  If you are expecting a shipment, and it is in process, you should have no problem receiving it but will not be able to send back.  If you have any questions, please contact Bruce at 2-9797.

USDA is requiring special permit to allow foreign soil brought into ANL.  Bruce is in the process of obtaining a permit for APS to allow foreign soil in/out of ANL.  Below is Bruces presentation and explanation on this USDA procedure:

Page 1 of 5

Page 2 of 5

 

Page 3 of 5

Page 4 of 5

Page 5 of 5

If you have questions or concerns, contact Bruce Glagola at 2-9797.