Mon, 17 Jun 2013 17:59:42 topup resumed at 17:56
We successfully rebooted IOCS33FB. Topup has been resumed at 17:56, and there was a positive topup injection with 100mA remaining stored beam.
Mon, 17 Jun 2013 17:49:07 topup aborted at 17:45 due to IOC reboot
topup was aborted at 17:45 due to Real Time Feedback IOC reboot
Mon, 17 Jun 2013 08:14:46 Top-up re-enabled
Top-up has been re-enabled at 08:06am. There is 94mA of stored beam.
Mon, 17 Jun 2013 07:30:31 Top-up Aborted
Top-up has been aborted due to L5 repairs.
Fri, 14 Jun 2013 08:42:18 Fill-on-Fill
A fill-on-fill was performed at 08:28. There is ~102mA of stored beam. Top-Up is ongoing.
Fri, 14 Jun 2013 08:24:29 Refill of SR may occur within the next hour In-Reply-To:
If we can get good extraction from the Booster, will we do a fill-on-fill without the usual 30 minute warning. We have an additional injector problem which may prevent us from filling the ring if we wait the additonal 30 minutes. Karen Schroeder
Fri, 14 Jun 2013 02:39:14 Top-up aborted at 02:00 In-Reply-To:
Due to an Injector issue, top-up was aborted at 02:00. No estimate for repair is foreseeable at the moment.
Thu, 13 Jun 2013 11:59:53 Shutter Permit Enabled
Shutter permit was enabled at 11:37am. There is 102mA of stored beam, top-up is ongoing.
Thu, 13 Jun 2013 11:16:25 RTFB Repairs
RTFB repairs are in progress. Next fill approx.12:00hrs
Thu, 13 Jun 2013 10:20:17 RTFB Investigation
The RTFB investigation is still ongoing. Next fill is unknown at this time.
Thu, 13 Jun 2013 09:52:10 Beam Lost
Stored beam has been lost at 09:41am due to a realtime feedback issue. We are currently investigating.
Thu, 13 Jun 2013 09:33:32 RMS Beam Motion
Since 09:23 RMS Beam Motion on the horizontal plane has been elevated due to RTFB issues. Controls personnel are investigating.
Thu, 13 Jun 2013 01:41:22 (no subject)
Top-up was aborted due to a booster RF trip that was rese. We don't expect any further disruption.
Wed, 12 Jun 2013 09:21:18 Excessive RMS beam motion from 08:47 to 09:03 In-Reply-To:
There was a major RMS beam motion starting at 08:47 due to issues with Storage Ring Real Time feedback program. Stored beam was lost at 09:03 during RT feedback troubleshooting, when the feedback was initialized.
Sat, 8 Jun 2013 09:59:49 IOC Reboot
We had to reboot an IOC with the storage ring orbit controllaw turned off. The reboot has been completed and we do not see any further disruption.
Sat, 8 Jun 2013 03:10:09 Top-up aborted In-Reply-To:
Due to an IOC reboot top up was aborted with the storage ring orbit controllaw turned off. The reboot has been completed and we do not see any further disruption.
Sat, 8 Jun 2013 02:32:29 IOC Reboot
We had to reboot an IOC with the storage ring orbit controllaw turned off. The reboot has been completed and we do not see any further disruption.
Sat, 8 Jun 2013 00:29:22 Injection issue
We are having problems injecting beam to 102mA. It is currently being investigated. Next fill will be at approximately 1am.
Fri, 7 Jun 2013 22:27:00 Beam loss
At 21:37 Stored beam was lost due to unknown reasons. During recovery a power supply failed . We will refill @ ~23:30
Fri, 7 Jun 2013 16:30:53 top up aborted In-Reply-To:
Due to a IOC problem we are temporarily aborting top up and control laws were suspended at 16:17 Normal operations resumed at ~16:30
Thu, 6 Jun 2013 12:20:27 SR orbit correction and topup were was not running from 11:57 to 12:19
SR orbit correction and topup were not running from 11:57 to 12:19 due to SR IOCS15FB issue
Thu, 6 Jun 2013 02:25:37 Top up aborted. In-Reply-To:
On Thursday Jun 6th 2013 at 02:12 Top-Up was aborted due to an IOCS15FB issue. Operations boot IOCS15FB. On Thursday Jun 6th 2013 at 02:24 Top-Up was started. Thank You, Steven LaBuda
Wed, 5 Jun 2013 18:49:47 Top-up has resumed
We have resumed Top-up. There is 87mA of stored beam in the SR.
Wed, 5 Jun 2013 18:36:47 Top-up Aborted
We are aborting Top-up and orbit control law to reboot an ioc. We will resume Top-up in approximately 10mins.
Wed, 5 Jun 2013 17:32:57 Beam Losses/Target Current In-Reply-To:
Repetitive beam losses (16:25, 16:48) due to SR RF issues has prompted management to lower the SR Target Current to 90mA. Top-up will slowly bring the current to 102mA. Beam ETA ~18:00.
Wed, 5 Jun 2013 15:03:53 topup was not running from 13:51 to 14:07
Topup was not running from 13:51 to 14:07 because of the Linac RF fault. Topup was resumed with 98.5mA remaining stored beam at 14:07.
Wed, 5 Jun 2013 09:11:08 Stored beam lost
On Wednesday June 5th 2013 at 08:35 stored beam was lost due to an RF trip. An investigation is ongoing.
Wed, 5 Jun 2013 11:10:45 Shutter permit at 09:25
At 09:25, shutter permit was enabled with 102mA stored beam. Top-up is ongoing.
Mon, 3 Jun 2013 08:06:57 There are 102mA stored beam.
Shutter permit was enabled for the start of fill #8 at 08:02. There are 102mA stored beam. Top-up is ongoing.
Mon, 3 Jun 2013 06:40:55 Stored beam lost fill #7
Stored beam was lost at 06:24. Control Group tech's have been called to fix the situation.
Mon, 3 Jun 2013 05:49:33 store #6 lost & shutters enabled for fill #7
On Monday June 3rd 2013 at 04:59 stored beam fill #6 was lost due to an RF trip. On Monday June 3rd 2013 at 05:43 shutters were enabled for fill #7. Thank You, Steven LaBuda
Mon, 3 Jun 2013 05:47:16 Shutters enabled for fill #6 In-Reply-To:
Shutter enabled for fill #6 on Monday June 3rd 2013 at 04:32. Thank You, Steven LaBuda
Mon, 3 Jun 2013 03:14:16 Stored beam lost
On Monday June 3rd 2013 at 02:19 stored beam was lost due to an RF trip. As of 03:13 Controls Group personnel is investigating IOCRFCAVS40. Thank You, Steven LaBuda
Sat, 1 Jun 2013 13:43:11 (no subject)
Stored beam has been below 100mA due to PAR RF issues. We believe that they are fixed for the moment. We will be performing a fill-on-fill at 14:00.